Skip to Content
Menu

Manufacturing Process Cost

by
Odoo

40.51

v 15.0 Third Party
Availability
Odoo Online
Odoo.sh
On Premise
Odoo Apps Dependencies Manufacturing (mrp)
Inventory (stock)
Discuss (mail)
Lines of code 571
Technical Name skit_manufacturing_process_cost
LicenseOPL-1
Websitehttp://www.srikeshinfotech.com
Versions 15.0 16.0
You bought this module and need support? Click here!
Availability
Odoo Online
Odoo.sh
On Premise
Odoo Apps Dependencies Manufacturing (mrp)
Inventory (stock)
Discuss (mail)
Lines of code 571
Technical Name skit_manufacturing_process_cost
LicenseOPL-1
Websitehttp://www.srikeshinfotech.com
Versions 15.0 16.0

Manufacturing Process Cost

Manufacturing Process Cost

Optimizing Production Efficiency and Resource Allocation.

Explore This Module

Overview

The manufacturing orders interface provides detailed cost analysis for material, labor, overhead, and overall production expenses, ensuring accurate evaluations.

Key Features

Comprehensive cost analysis across Material, Labor, Overhead, and Overall Costing tabs.
Integration with Components and Work Order sections for seamless data population.
Accurate computation of planned quantities and durations for precise cost evaluations.
In-depth reporting with MRP Costing Report for insights into manufacturing efficiency.

Screenshots

The manufacturing orders interface offers four distinct tabs delineating cost analysis: material cost, labor cost, overhead cost, and overall costing.

The material cost tab specifically calculates the expenses associated with materials utilized in the production process of the respective product or order. A detailed breakdown of the material cost computation will be provided subsequently.

Product: Upon clicking the save button, products entered within the "Components" tab will seamlessly populate the material cost tab.

Planned Qty: Dynamically retrieves data from the "to consume" column within the "Components" tab.

Cost/Unit: References the cost price of the respective product, obtainable from the product profile.



Total Cost: Computed by multiplying the planned quantity by the cost per unit.

For instance, considering the example provided, with a planned quantity of 1 and a cost per unit of 50 for the product "Screw," .

Total Cost = 1*50

The total cost would amount to 50.

Similar computations are applied across all products, ensuring accurate cost evaluations, such as the total cost for the product "Bolt," which in this scenario would equate to 100.

Total Material Cost: It is the sum of all the values in "total cost" column

Availability of Labour Cost in Manufacturing order.

The purpose of labor cost is to estimate, control, and allocate expenses related to employing workers.

Enable the Work Order in Manufacturing -> Configuration -> Setting -> Work Order

Operation: Upon clicking the save button, operations entered within the "Work order" tab will seamlessly populate the labour cost tab.

Work center: Fetch the work center for the operation in work order tab

Planned Duration in Minutes: Dynamically retrieves data from the "Expected Duration" column within the "Work Order" tab.

Cost/Unit: References the employee hourly cost of the respective work center.

Employee Capacity : Get the employee capacity from operation.

Total Cost: Computed by multiplying the "Employee Capacity * Cost/Hour * Real Duration".

For instance, considering the example provided, with a Employee Capacity of 1 ,a cost per hour of 20 for the operation "Machine" and a real duration of 00:29 seconds.

Total Cost = 1*20*00:29

The total labour cost would amount to 0.17.

Availability of Overhead Cost in Manufacturing order.

Overhead cost is to account for indirect expenses associated with production facilities and support services.

Operation: Operations entered within the "Work order" tab will seamlessly populate the Overhead cost tab.

Work center: Fetch the work center for the operation in work order tab

Planned Duration in Minutes: Dynamically retrieves data from the "Expected Duration" column within the "Work Order" tab.

Cost/Unit: It will fetch and add the cost of power cost, indirect employee cost, utilization cost, rent, depreciation cost, interest and maintenance cost price for cost/hour in each work center.

Total Cost: Computed by multiplying the "Cost/Hour * Real Duration".

For instance, considering the example provided, with a cost per hour of 70 for the operation "Machine" and the real duration of 00:29 seconds.

Total Cost = 70*00:29

The total cost would amount to 0.58.

Availability of Overall Cost in Manufacturing order

It will get the total of Material cost, Labour cost and Overhead cost.

Availability of Mrp Costing Report in Reporting of Manufacturing order.

It displays the records of manufacturing order which is done and cancelled.

Our Services

Odoo Customization
Odoo Implementation
Odoo Support
Hire Odoo Developer
Odoo Integration
Odoo Migration
Odoo Consultancy
Odoo Book Keeping
Odoo Licensing Consultancy

Our Industries

Trading

Easily procure and sell your products

POS

Easy configuration and convivial experience

Education

A platform for educational management

Manufacturing

Plan, track and schedule your operations

E-commerce & Website

Mobile friendly, awe-inspiring product pages

Service Management

Keep track of services and invoice

Restaurant

Run your bar or restaurant methodically

Hotel Management

An all-inclusive hotel management application

Support

SrikeshInfotech is an India based software company that focuses on highly qualitative, timely delivered and cost-effective offshore software development. We have 16+ years of technical and functional experience in ERP Customization and Implementation. The experience made us understand all the logics followed in business both functionally and technically.

Please note that You're not allowed to distribute this module after purchase! Incase of any question regarding this module feel free to email us on info@srikeshinfotech.com or contact us on skype srikesh2008 or raise a ticket on support.

Get Help & Support

Email Contact Us
Odoo Proprietary License v1.0

This software and associated files (the "Software") may only be used (executed,
modified, executed after modifications) if you have purchased a valid license
from the authors, typically via Odoo Apps, or if you have received a written
agreement from the authors of the Software (see the COPYRIGHT file).

You may develop Odoo modules that use the Software as a library (typically
by depending on it, importing it and using its resources), but without copying
any source code or material from the Software. You may distribute those
modules under the license of your choice, provided that this license is
compatible with the terms of the Odoo Proprietary License (For example:
LGPL, MIT, or proprietary licenses similar to this one).

It is forbidden to publish, distribute, sublicense, or sell copies of the Software
or modified copies of the Software.

The above copyright notice and this permission notice must be included in all
copies or substantial portions of the Software.

THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR
IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY,
FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT.
IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM,
DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE,
ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER
DEALINGS IN THE SOFTWARE.

Please log in to comment on this module

  • The author can leave a single reply to each comment.
  • This section is meant to ask simple questions or leave a rating. Every report of a problem experienced while using the module should be addressed to the author directly (refer to the following point).
  • If you want to start a discussion with the author or have a question related to your purchase, please use the support page.