MRP Advanced Process Costing (CodeTrade)
by CodeTrade India Pvt. Ltd. https://www.codetrade.io/$ 148.05
| Availability |
Odoo Online
Odoo.sh
On Premise
|
| Odoo Apps Dependencies |
•
Discuss (mail)
• Inventory (stock) • Manufacturing (mrp) |
| Lines of code | 1261 |
| Technical Name |
mrp_advanced_costing_codetrade |
| License | OPL-1 |
| Website | https://www.codetrade.io/ |
| Versions | 16.0 17.0 18.0 19.0 |
| Availability |
Odoo Online
Odoo.sh
On Premise
|
| Odoo Apps Dependencies |
•
Discuss (mail)
• Inventory (stock) • Manufacturing (mrp) |
| Lines of code | 1261 |
| Technical Name |
mrp_advanced_costing_codetrade |
| License | OPL-1 |
| Website | https://www.codetrade.io/ |
| Versions | 16.0 17.0 18.0 19.0 |
MRP Advanced Process Costing
Enterprise
Odoo.sh
MRP Advanced Process Costing
Manage planned and actual manufacturing costs with material, labour, and overhead breakdowns directly on Bills of Materials and Manufacturing Orders.
Choose manual or work-center based costing, define hourly labour and overhead rates, and monitor estimated versus actual production costs with clarity.
A practical process costing workflow for manufacturers who need stronger cost visibility across BoMs, operations, work orders, and production orders.
View DemoSet up manufacturing process costing in minutes.
No complex customization. Just install the module and start tracking planned and actual manufacturing costs.
Configure costing rules, hourly rates, and detailed cost breakdowns from the standard MRP backend screens.
Key Features
Process Costing Setup
Enable process costing from Manufacturing settings and manage whether labour and overhead should come from manual operation rates or work center rates.
Flexible Costing Methods
Use manual operation rates when you want direct control, or switch to work-center based costing to apply labour and overhead charges from each work center automatically.
BoM Material Costing
View direct material costs on BoM lines with cost per unit, planned quantity, and total material cost rolled up into overall BoM costing totals.
Labour And Overhead Breakdown
Track planned labour and overhead costs by operation and work order with applied hourly rates, planned hours, actual hours, and total cost values.
Actual MO Cost Analysis
Compare planned versus actual material, labour, and overhead costs on Manufacturing Orders and calculate the final actual unit cost based on produced quantity.
Process Costing Method
Choose the process costing method from Manufacturing settings and decide whether labour and overhead are driven manually or from the selected work center.
Manual Cost Configuration
Update the labour cost per hour and overhead cost per hour manually.
BoM Direct Material Labour And Overhead Cost
Update material, labour and overhead cost with planned quantity, unit cost, and total material value for each component.
Manufacturing Order Costing in manual mode
Open a Manufacturing Order to update labour, and overhead costs and together reflects in the final total cost.
Work Order Actual Cost Tracking in manual mode
Monitor actual hours on work orders and let the module calculate actual labour and overhead value according to the values manually added.
Work Center Cost Configuration
Maintain labour cost per hour and overhead cost per hour on work centers so production costing can use accurate operational rates.
BoM Direct Material Cost in Work-Center mode
Review direct material cost lines on the Bill of Materials with planned quantity, unit cost, and total material value for each component.
BoM Labour And Overhead Cost in Work-Center mode
Analyze planned labour and overhead costs per operation on the BoM and understand how each routing step contributes to total estimated cost.
Manufacturing Order Costing in Work Center mode
Open a Manufacturing Order to review planned and actual material, labour, and overhead costs together with the final total and product unit cost.
Work Order Actual Cost Tracking
Monitor actual hours on work orders and let the module calculate actual labour and overhead values for more reliable production costing analysis.
After manufacturing is done
Monitor the cost on total actual cost, labour , overhead , materails and all together updates the Product unit cost.
Costing Reports And Visibility
Print BoM and Production Order costing reports and keep cost visibility available across costing tabs, work orders, and reporting actions.
Version 1.0 : 16.0.0.0.0
10 June 2026
This Odoo app cannot be used with Odoo Online (SaaS).
It adds process costing to manufacturing by calculating planned and actual material, labour, and overhead costs on Bills of Materials, work orders, and Manufacturing Orders.
Yes. The module supports both manual costing on operations and work-center based costing from hourly rates configured on each work center.
Costing details are shown on BoM costing tabs, Manufacturing Order costing tabs, work orders, work centers, and through dedicated BoM and Production Order cost reports.
Yes. The module tracks planned cost values and also computes actual material, labour, and overhead cost on completed Manufacturing Orders, including the final product unit cost.
Language Support
Our Services
Odoo Proprietary License v1.0 This software and associated files (the "Software") may only be used (executed, modified, executed after modifications) if you have purchased a valid license from the authors, typically via Odoo Apps, or if you have received a written agreement from the authors of the Software (see the COPYRIGHT file). You may develop Odoo modules that use the Software as a library (typically by depending on it, importing it and using its resources), but without copying any source code or material from the Software. You may distribute those modules under the license of your choice, provided that this license is compatible with the terms of the Odoo Proprietary License (For example: LGPL, MIT, or proprietary licenses similar to this one). It is forbidden to publish, distribute, sublicense, or sell copies of the Software or modified copies of the Software. The above copyright notice and this permission notice must be included in all copies or substantial portions of the Software. THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE.
Please log in to comment on this module