Skip to Content
Menu

MRP Routing Workcenter Capacity

by
Odoo
v 16.0 Third Party
Download for v 16.0 Deploy on Odoo.sh
Availability
Odoo Online
Odoo.sh
On Premise
Odoo Apps Dependencies Manufacturing (mrp)
Inventory (stock)
Discuss (mail)
Lines of code 150
Technical Name mrp_routing_workcenter_capacity
LicenseAGPL-3
Websitehttps://github.com/avanzosc/mrp-addons
You bought this module and need support? Click here!

MRP Routing workcenter capacity

  • In MRP operations new fields capacity, time before production, and time after production.
  • When calculating the "Expected Duration" of the OF work orders, it will take the capacity defined in the operation, not the one defined in the Work Center.
  • The fields "Time before prod.", "Time after prod." defined in the operation also participate in the calculation, if they are informed. If they are not informed, those of the Work Center will be used.

Bug Tracker

Bugs are tracked on GitHub Issues. In case of trouble, please check there if your issue has already been reported. If you spotted it first, help us smash it by providing detailed and welcomed feedback.

Do not contact contributors directly about support or help with technical issues.

Credits

Contributors

Please log in to comment on this module

  • The author can leave a single reply to each comment.
  • This section is meant to ask simple questions or leave a rating. Every report of a problem experienced while using the module should be addressed to the author directly (refer to the following point).
  • If you want to start a discussion with the author, please use the developer contact information. They can usually be found in the description.
Please choose a rating from 1 to 5 for this module.