Allows to operate the components from a MO
Adds an MRP default workorder time
Share product drawing and step files with vendors and link them in the workorder tablet view.
Edit components in production order
Allows to consider demand estimates using MRP multi level.
Propagate a package from a component to a finished product
Allows to plan production from the desired finish date
Automatically generate lot for tracked and manufactured products.
Adds an existing operation from the Bill of Material
Split Manufacturing Orders into smaller ones
Extra changes for production split
Show state of upstream moves in component lines.
Shortcut between Manufacturing Request and Bom report
Propagate a serial number from a component to a finished product (subcontracting integration)
Lock the planning of a MRP workorder to avoid rescheduling