Manufacturing Work Order Alert on MRP Work Center Alert on MRP WorkOrder Alert on Manufacturing Work Center Alert workcenter alert on mrp work center timer alerts work center timing notification mrp work order notification mrp work order timer alert on mrp
Allow to block time on work orders
MRP Work Order History
Organise Workcenters by section
Start/Block/Unblock/Pause/Finish multiple matching workorders at once
Print Product Labels from MRP Workorders | Quality Check | Tablet View
Lock the planning of a MRP workorder to avoid rescheduling
Sets default users for workcenters and controls work order visibility.
Real-time duration tracking for work orders even when tablet view is closed
Subcontract work orders with manual control and batch processing
In production order line lots popup, filter lots based on their location and availability
This app will allow you to have multiple branch feature on machine repair module.
Schedule and manage maintenance on machine and tools.
The Restrict MO Validation if Real Duration Not Set app for Odoo ensures that Manufacturing Orders (MOs) cannot be validated unless the actual production duration is entered. It helps maintain accurate production records by either blocking validation entirely or showing a confirmation popup when the real duration is missing. This module improves data completeness, reduces errors in production reporting, and integrates seamlessly with Odoo’s Manufacturing (MRP) and Inventory modules, making production planning more reliable and controlled. Mandatory Real Duration in MO, Mandatory Real Duration in MO, Restrict the MO validation if real duration not set, Require MO Duration, MO Duration Enforcement, Real Duration Required, Validate MO Duration, MO Time Entry Mandatory, Enforce Actual Duration, MO Duration Check, Mandatory Production Time, Force MO Duration, MO Duration Lock, Actual Time Required, Production Duration Enforce, MO Time Restriction, How to make real duration mandatory in Odoo Manufacturing Orders? Can Odoo block MO validation without actual production time? How to enforce time entry before validating a work order in Odoo? How to ensure accurate production duration in Odoo MRP?
Check raw material availability before starting Manufacturing Orders — Single, Multi, or All BOMs
Automatically plan manufacturing after creating it