Real-time duration tracking for work orders even when tablet view is closed
Subcontract work orders with manual control and batch processing
Sale MRP Calculator. MRP material calculation for all bom level, mrp calculator, From Sale Order. Auto Sum product Qty and Merge same sku. MRP Plan for multi product and warehouse, Get mrp product need before manufacture. MRP Request plan to generate MO or PO or Picking。
MRP Multi Level Bill Of Materials Manufacturing multi BOM MRP Multiple Layer Bill of Material MRP Multi BOM Structure Manufacturing Multi Level Bill Of Material MRP Multi Level Bill Of Material MRP multiple BOM MRP child BOM hierarchy in MRP multi BOM
In production order line lots popup, filter lots based on their location and availability
This app will allow you to have multiple branch feature on machine repair module.
Schedule and manage maintenance on machine and tools.
The Restrict MO Validation if Real Duration Not Set app for Odoo ensures that Manufacturing Orders (MOs) cannot be validated unless the actual production duration is entered. It helps maintain accurate production records by either blocking validation entirely or showing a confirmation popup when the real duration is missing. This module improves data completeness, reduces errors in production reporting, and integrates seamlessly with Odoo’s Manufacturing (MRP) and Inventory modules, making production planning more reliable and controlled. Mandatory Real Duration in MO, Mandatory Real Duration in MO, Restrict the MO validation if real duration not set, Require MO Duration, MO Duration Enforcement, Real Duration Required, Validate MO Duration, MO Time Entry Mandatory, Enforce Actual Duration, MO Duration Check, Mandatory Production Time, Force MO Duration, MO Duration Lock, Actual Time Required, Production Duration Enforce, MO Time Restriction, How to make real duration mandatory in Odoo Manufacturing Orders? Can Odoo block MO validation without actual production time? How to enforce time entry before validating a work order in Odoo? How to ensure accurate production duration in Odoo MRP?
Make stock move dates editable.
Check raw material availability before starting Manufacturing Orders — Single, Multi, or All BOMs
Manufacturing - Mass Serial Number
Manufacturing Cost Journal Entries with Analytic Tracking | Production Accounting with Analytic Accounts
Add Extra components in your finished good item while manufacturing it and have the separate transfer entry for extra item consumed.
This app shows analytic entries (items) of manufacturing orders and works orders.
MRP backdate operations, incl. posting inventory, mark MO as done, backdate work orders
mrp backdated manufacturing order backdated mrp order backdated mrp forcedated manufacturing order force dated mo forcedate mrp order forcedate stock move backdate mrp order backdate manufacturing order backdate.