base module for zero systems advanced MRP OverHead Costs
Handle MRP Product Produce Delay in hours not in days.
Allows to plan production from the desired finish date
Automatically generate lot for tracked and manufactured products.
Adds an existing operation from the Bill of Material
Preserve assigned lots when splitting production orders.
Allows you to use Manufacturing Request as a previous step to Manufacturing Orders for better manufacture planification.
Link production with projects
Control BoM selection from properties on sale order lines
Propagate a serial number from a component to a finished product (subcontracting integration)
Substitute MRP Products
Allow to block time on work orders
MRP Workcenter Overview backport from Odoo 13 CE
Switch easily between Work Centers and Work Orders
See the last user who worked on a workorder
Lock the planning of a MRP workorder to avoid rescheduling
Display lot number on workorders kanban
Set Internal References to BoM Operations and Work Orders