Infrastructure Project Management for Contractors (Airports, Railways, Metro) | Mega Infrastructure Projects Management for Odoo
by Probuse Consulting Service Pvt. Ltd. http://wwww.probuse.com$ 3139.97
Infrastructure Project Management for Contractors (Airports, Railways, Metro) | Mega Infrastructure Projects Management for Odoo
Odoo Infrastructure Contractors Suite : Airports, Railways and Metro | Infrastructure Construction Management Suite for Odoo
Manage large infrastructure projects for Airports, Railways, and Metro contractors.
Odoo Infrastructure Projects Contractors is a comprehensive end to end project and contract management solution designed specifically for EPC contractors, construction companies and infrastructure firms handling large scale projects such as Metro Rail, Railway, Airport, Bridge, Highway and Underground Utilities.
This module extends standard Odoo functionality to provide complete control over the entire project lifecycle from tender bidding to final billing with integrated BOQ management, job costing, subcontractor control, IPC management, retention accounting and progress billing.
Overall Purpose
The overall purpose of this module is to deliver a centralized, transparent and fully integrated system that gives contractors complete operational and financial control over high value infrastructure projects while reducing manual work, billing errors and cost overruns.
Scope of Module
The Odoo Infrastructure Projects Contractors module is designed to manage and control the complete lifecycle of large scale infrastructure and EPC projects within Odoo. The scope of this module covers operational, contractual, financial and execution level management required for Metro, Railway, Airport, Bridge, Highway and other heavy civil projects.
Advanced Railway, Metro and Airport Infrastructure Management System | Railway, Metro and Airport Heavy Infrastructure Project Control Platform
Railway, Metro and Airport Infrastructure Project Costing and Contract Management Platform
Railway, Metro and Airport Infrastructure ERP | Advanced Project Costing and Contract Management
Main Features of Odoo Infrastructure Projects Contractors
- Bidding/Tender and Contract Management
- Tender/Bid Creation with BOQ Attachment
- Pre Tender Cost Estimation
- Bid Version Control
- Automatic Project Creation on Tender Award
- Tender Document Management
- Internal Review and Approval Workflow
- Project Creation and Contract Control
- Automatic Project Creation from Won Tender
- Project Budget Initialization
- Work Breakdown Structure (WBS)
- Contract Value and Retention Configuration
- Project Stage Management
- BOQ (Bill of Quantities) Management
- Project Wise BOQ Creation
- BOQ Linked with Job Cost Sheet
- BOQ Revision and Version Control
- Rate Analysis per BOQ Line
- Planned vs Executed Quantity Tracking
- Job Costing and Estimation
- Detailed Job Cost Sheet per Project
- Material, Labour, Overhead Breakdown
- Job Estimate Generation
- Sales Quotation Creation from Estimate
- Job Order and Execution Management
- Job Order Creation from Project
- Task Based Execution Structure
- Status Tracking
- Material Requisition from Job Order
- Direct Purchase Order from Job Order
- Timesheets, Risk and Incident Logging
- Equipment Allocation and Maintenance Request
- Change Order Creation (Project / Job Order Level)
- Subcontractor Management
- Subcontractor Job Order Creation
- Deliverables Tracking
- Material Requisition and Purchase Order
- Subcontractor IPC Creation (Backend and Portal)
- Vendor Bill Creation with Retention Entries
- Subcontractor Advance Management
- Customer Billing and IPC Management
- Customer IPC Creation
- Progress Billing Based on actual vendor bill quantity, actial purchase quantity or manual invoice
- Advance Payment Adjustment
- Retention Handling in Customer Invoice
- Invoice Generation from IPC
- Certified vs Claimed Value Tracking
- Progress Billing from Job Cost Sheet
- Generate Progress Billing directly from Job Cost Sheet
- Billing Based on Actual Vendor Bill Quantities
- Billing Based on Actual Purchase Quantities
- Manual Invoice Based Progress Billing Option
- Real Time Quantity and Cost Validation Before Billing
- Procurement and Material Control
- Material Requisition Workflow with Approval
- RFQ and Purchase Order Creation
- Vendor Bill Integration with Job Cost Sheet
- Material Consumption Tracking
- BOQ Quantity vs Purchase Quantity Monitoring
- Equipment and Maintenance Management
- Equipment Creation and Allocation to Job Orders
- Equipment Cost Tracking
- Maintenance Requests and Breakdown Tracking
- Equipment Downtime Analysis
- Change Order and Variation Management
- Project and Job Order Level Change Orders
- Cost Impact and Variation Tracking
- Client Approval Workflow
- Separate Billing for Variations
- Contractor Job Order Inspection and Evaluation
- Task Completion Verification
- Quality and Compliance Checks
- Progress Monitoring
- Defect and Non Conformance Logging
- Project Notes and Job Order Notes
- Overall project and task specific updates
- Key decisions and approvals
- Risk and issue tracking
- Client communications and instructions
- Material, resource and scope change requirements
- RFI Management for Construction Projects
- Online RFI submission with document attachments
- Automatic unique RFI number and secure backend storage
- Real time status tracking for customers and suppliers
- Internal communication, review and controlled closure by Project Team
- PDF export, feedback system and configurable RFI stages and types
- Construction Project Transmittals, Submittals and Task Orders
- Manage Submittals: materials, shop drawings, method statements and approvals
- Manage Transmittals: drawings, reports, revisions and formal document exchange
- Track status of all documents in real time
- Secure centralized storage with version control and audit trail
- Streamlined communication between project team, clients and suppliers
- Construction Project Daily Log
- Enable Project Users and Project Managers to create daily logs for construction and job contracting projects.
- Record work performed, manpower, equipment, materials and site conditions.
- Attach supporting documents such as photos, drawings and reports.
- Review and approve logs by supervisors or project managers.
- Centralized storage and reporting for audits, progress tracking and project performance analysis.
- Document Management for Job Contracting and Construction Projects
- Link documents (drawings, contracts, invoices, receipts) to Job Orders and Job Cost Sheets.
- Track all project related paperwork in a centralized system.
- Streamline workflow and improve document organization.
- Enable accurate cost tracking for labor, materials and tasks.
- Support review, approval and reporting for project management
- For more details, please check the screenshot below.
This module enables contractors to create, manage and track bids for government, private and semi government tenders, including large scale metro, railway and airport infrastructure projects. We have developed a generic Odoo based Bid Management application that allows businesses to efficiently prepare and submit bids across government, private and semi government sectors, with structured workflows and controls tailored to the complex requirements of metro, railway, and airport developments.
Enable efficient creation, setup and management of large scale infrastructure projects, including railway, metro and airport construction. Maintain complete control over contracts, track milestones, manage budgets and ensure compliance with project specifications and regulatory requirements.
The Project BOQ Construction Contracting module provides comprehensive BOQ management tailored for complex railway, metro and airport infrastructure projects within Odoo. It supports the preparation of highly detailed Bills of Quantity covering civil works, track works, structural components, station buildings, terminals, runways, MEP systems, signaling, electrification and associated infrastructure. BOQ lines can be systematically categorized into materials, labour, plant and machinery, subcontracting and overheads to match large scale infrastructure contract structures.
This app enables comprehensive management of projects and contracts using its job cost sheet feature, specifically designed for large scale railway, metro and airport infrastructure projects. It allows users to prepare detailed job cost sheets to plan and monitor material, labour, plant and machinery, subcontracting and overhead costs for each project.
This module enables the creation of detailed job estimates by itemizing costs across materials, labour, plant and machinery, subcontracting and overheads. It allows users to generate accurate cost breakdowns for complex projects and seamlessly share estimates with customers. The module also supports converting job estimates into official sales quotations, streamlining the sales workflow while ensuring clients receive precise, transparent and comprehensive pricing information. This functionality is especially useful for large scale railway, metro and airport infrastructure projects, where detailed cost planning and accurate client communication are critical.
The Job Order and Execution Management module enables efficient planning, monitoring and control of project execution for complex infrastructure projects such as railway lines, metro corridors and airport terminals. Job orders can be automatically created from projects, ensuring alignment with the overall project scope and contract requirements.
The Subcontractor Management module enables efficient oversight and control of subcontracted work in large scale infrastructure projects such as railway lines, metro corridors, and airport terminals. Subcontractor job orders can be created directly from the main projects job orders, allowing clear assignment of responsibilities and effective tracking of deliverables.
The module supports material requisitions and purchase orders specific to subcontractor tasks, ensuring timely availability of resources. It also facilitates Subcontractor IPC (Interim Payment Certificate) creation via both backend and portal access, streamlining approvals and payment workflows.
Vendor bills can be generated with retention entries, while advance payments to subcontractors are tracked and managed, ensuring full financial transparency. This functionality ensures that complex, multi package, multi location infrastructure projects are executed efficiently, with accountability, accurate cost management, and timely completion of subcontracted work.
The Interim Payment Certificate (IPC) module serves as a formal mechanism to certify the value of work completed by contractors or subcontractors up to a specific date in large scale infrastructure projects such as railway lines, metro corridors and airport terminals. It facilitates periodic payments, ensuring contractors are compensated for completed work while accounting for retention, advance recoveries and other contract specific financial terms. This process helps maintain steady cash flow, financial transparency and accountability across complex, multi package projects.
The module extends Odoo Sales and Project functionality by introducing a structured IPC workflow tailored for infrastructure projects. Users can generate, manage and track IPCs linked to project milestones, subcontractor/job orders and client contracts. With seamless integration across Sales Orders, Invoices and Projects, the module ensures progress billing is accurate, traceable and streamlined. It also supports automatic handling of retention and advance recoveries, including the generation of customer invoices from IPCs, providing precise financial control for multi location railway, metro and airport infrastructure developments.
This module enables the creation of customer invoices directly from the job cost sheet, supporting progress billing based on detailed cost components such as materials, labour and overheads. Specifically designed for large scale railway, metro and airport infrastructure projects, it allows project managers to convert approved job cost sheets into accurate invoices for periodic billing. This ensures that progress payments are aligned with actual work completed, provides transparency in cost allocation, and streamlines financial management across multi package, multi location infrastructure projects.
The Procurement and Material Control module streamlines the entire material management process for large scale railway, metro and airport infrastructure projects. It enables users to raise material requisitions with multi level approvals, generate RFQs and purchase orders and integrate vendor bills directly with job cost sheets for accurate tracking of material, labour and overhead costs. The module also allows real time monitoring of material consumption and comparison of actual purchase quantities against BOQ quantities, ensuring budget compliance, reducing wastage and maintaining transparency throughout the project lifecycle. By providing end to end control over procurement and material usage, this module supports efficient execution and cost management in multi package, multi location infrastructure projects.
This app enables users to efficiently manage equipment allocation and maintenance directly from job orders or work orders for large scale metro, railway, and airport infrastructure projects. It allows seamless assignment of equipment required for specific tasks, tracks the condition and availability of each asset, and ensures timely preventive and corrective maintenance. By integrating equipment and maintenance management into the job order workflow, the app optimizes resource utilization, reduces downtime, and helps maintain project schedules and budgets. Additionally, it logs maintenance history, tracks associated costs, and generates reports, providing enhanced transparency, control, and efficiency across multi package, multi location infrastructure projects.
This app enables project teams to efficiently create, manage, and track change orders within the context of job costing, job contracting, and large scale construction projects. Specifically designed for railway, metro, and airport infrastructure projects, it allows users to document scope changes, update cost estimates, and adjust project schedules in real time. By integrating change orders with job cost sheets, project budgets, and work orders, the app ensures that all modifications are accurately reflected, approvals are properly tracked, and financial and timeline impacts are managed effectively. This functionality provides greater control, transparency, and accountability across multi package, multi location infrastructure projects.
The app offers an inspection feature for Job Orders specifically designed for railway, metro, and airport infrastructure construction projects. This feature streamlines the process of verifying task completion, ensuring that work adheres to quality standards, regulatory compliance and project specifications. By integrating inspections directly into job orders, the module enables project teams to monitor progress in real time, identify issues promptly, and maintain efficient workflow management. This ensures that large scale, multi package infrastructure projects are executed with consistent quality, transparency, and timely completion.
The Project Notes and Job Order Notes feature allows teams to record and track important updates, instructions, risks, material requirements, and progress for both overall projects and individual job orders. It ensures clear communication, proper documentation and transparency across railway, metro, and airport infrastructure projects.
This application is a centralized Request for Information (RFI) Management System built for large scale construction and contracting projects such as railway infrastructure, airport construction and expansion, and metro or urban transit developments. It enables customers, suppliers and project teams to submit, track, and respond to RFIs through a secure digital platform, ensuring clear communication, accountability, and organized documentation throughout the project lifecycle.
This application provides a centralized platform to manage Submittals and Transmittals for construction and contracting projects, specifically tailored for railway, metro and airport infrastructure development. It allows project teams, clients, and suppliers to submit, track, review and approve documents such as drawings, specifications, materials and reports, ensuring streamlined communication, secure document storage and full audit trails for complex infrastructure projects.
This application enables Project Users and Project Managers to create and manage Daily Logs for Construction Projects, Job Contracting Projects and Work Orders/Job Orders in Metro, Railway and Airport infrastructure projects. Users can record daily activities including work performed, manpower, equipment, materials and site conditions. Logs can include attachments such as photos, drawings or reports and are reviewed and approved by supervisors or project managers. All daily logs are stored securely in a centralized system, allowing for progress tracking, reporting, audits and performance analysis, ensuring better control and transparency across complex infrastructure projects.
This application allows you to link documents to Job Orders and Job Cost Sheets for railway and metro construction projects. It provides a centralized system to track and manage all relevant paperwork such as drawings, contracts, invoices and material receipts associated with each job. This ensures a streamlined workflow, proper organization and easy access to all project documentation, supporting accurate cost tracking, progress monitoring and overall job management.
Infrastructure Project Lifecycle Workflow
The workflow begins when a government authority or private sector organization announces a tender for an infrastructure project such as Railway, Metro, Airports or maintenance services. The Business Development team identifies the opportunity through tender portals, direct invitations, or client communication and registers the tender in the system. This record captures key details including client information, scope of work, submission deadlines, eligibility requirements and estimated project value. After an internal feasibility review, management decides whether to participate in the bid.
Once approved to proceed, a project is initiated in the system for estimation purposes. The estimation and planning teams study the tender drawings, technical specifications and contractual terms. A detailed Bill of Quantities (BOQ) is prepared or validated based on the tender documents. The BOQ is then structured into a job cost sheet where projected costs are categorized under materials, labour and overheads. Quantity take offs are verified, labour productivity is estimated, equipment utilization is planned and risk provisions are considered. Based on these inputs, a comprehensive cost estimation is prepared, including markup and target profit margins.
After internal technical and commercial approvals, a formal quotation or bid proposal is generated and submitted to the client within the tender deadline. If the bid is successful and the contractor is awarded the project, the quotation is converted into a confirmed sales order. A formal contract agreement is then prepared and signed, defining scope, timelines, payment terms, retention percentage, advance payment conditions and change order procedures. If the contract includes an advance payment clause, an advance invoice is generated as per agreed terms. At this stage, the financial structure of the project is configured, including retention rules.
Once the contract is executed, the project becomes active and the Project Manager creates job orders to break down the scope into manageable work packages such as excavation, structural works, electrical installations, plumbing, finishing, or other infrastructure components. These job orders serve as execution units for planning, cost tracking, and performance monitoring. Site engineers raise material requests based on work requirements, procurement officers issue purchase orders to approved vendors, and upon delivery the store department updates inventory records. Vendor bills are recorded by the finance team, and actual material costs are posted automatically to the projects job cost sheet.
Labour activities are managed through daily timesheets recorded by supervisors, capturing workforce hours allocated to specific job orders. These labour entries are converted into actual labour hours in real time. Equipment required for execution is registered and allocated to job orders, and equipment usage costs are absorbed into the project. If maintenance related tasks arise during execution, maintenance requests are logged, inspections and checklists are completed, materials are planned and requisitioned, and the task is closed after completion.
Risk management is ongoing throughout the project lifecycle. Potential risks are identified and documented, and if incidents occur, they are recorded against the relevant job orders and resolved through corrective actions. When scope variations arise due to design changes, site conditions, or client instructions, a change request is initiated. The Project Manager reviews the change internally and submits it to the client for approval. Once approved, the contract or sales order is revised to reflect the updated scope and financial impact.
If parts of the project are subcontracted, subcontract job orders are created and subcontract purchase orders are issued. Deliverables are tracked against milestones, subcontractor progress is certified through IPCs, vendor bills are recorded, and retention amounts are processed according to subcontract terms. Daily site logs are prepared by site engineers to record progress, manpower deployment, equipment usage, weather conditions and any site issues. These logs are submitted to the Project Manager for review and documentation.
Billing activities occur after contractual setup and measurable work progress. Advance invoices are issued at the beginning if agreed in the contract. As execution progresses, Interim Payment Certificates are prepared based on certified quantities of completed work. Progress invoices are generated reflecting work done, retention deductions, and advance recovery as per contractual terms. All actual costs from materials, labour, equipment and subcontractors are continuously posted to the job cost sheet, enabling real time profitability monitoring and cost control. Upon project completion, a final invoice is generated, retention is released according to agreement and the project is financially closed once all contractual and financial obligations are fulfilled.
Edition Compatibility:
Enterprise Odoo.sh Community
Metro Infrastructure Project
Bid Creation
Step 1
Create Tender Bid
Step 2
Record tender opportunities
Step 3
Prepare bid data for estimation
Step 4
Create project if bid is won
Tender Bid Form with Tender Details Tab : Metro Project
Tender Bid Form with Tender Documents Tab : Metro Project
Tender Bid Form with Location Details Tab and Project Creation : Metro Project
Tender Bid Form with Create Project Button : Metro Project
Created Project Form View
Created Project Form View with Tender Details
Contract Management
Step 1
Create Contract
Step 2
Generate Initial Invoice
Contract Kanban View
Contract Form View with Contract Details Tab
Contract Form View with Plan Details Tab
Contract Form View with Internal Note Tab
BOQ and Job Cost Sheet Setup
Step 1
Create Project BOQ
Step 2
Define materials, labor and overhead items
Step 3
Convert BOQ to Job Cost Sheet
Step 4
Create Job Estimation
Step 5
Generate project quotation / sale order
Bill of Quantities Form with Materials Tab
Bill of Quantities Form with Labours Tab
Bill of Quantities Form with Overhead Tab and Convert to Job Cost Sheet Button
Converted Job Cost Sheet Form with Materials Tab
Job Cost Sheet Form with Labours Tab
Job Cost Sheet Form with Overhead Tab
Create Job Estimate Button on Job Cost Sheet
Created Job Estimation with Materials Tab
Created Job Estimation with Labours Tab
Created Job Estimation with Overhead Tab
Create Quotation Button on Job Estimation Form
Open Created Sale Quotation from Job Estimate
Project Execution
Step 1
Activate Project
Step 2
Create Job Orders
Open Tasks for Related Project
Subcontractor Job Order Execution
Step 1
Create Subcontractor Job Orders
Step 2
Assign Subcontractor Purchase Orders
Step 3
Track Deliverables
Step 4
Generate Subcontractor IPC
Step 5
Process Vendor Bill from IPC
Create Subcontractor Job Button on Job Order
Created Subcontractor Job Order Form with Subcontract Details Section
Subcontractor Job Order Form with Deliverables Section
Subcontractor Job Order with Purchase Order Lines and Create Purchase Order Button
Open Created Purchase Order from Subcontractor Job Order
IPC Form Creation in My Account Portal
Interim Payment Certificate with Digital Signature Option
Submit Button on IPC
Submmitted IPC
Subcontractor IPC Backend Form with Options
Create Vendor Bill Button on Subcontractor IPC
Created Vendor Bill from Subcontractor IPC
Retention Entries Smart Button on Posted Vendor Bill Form
Open Retention Entry Form with Vendor Bill Create Button
Internal Job Order Execution
Step 1
Raise Material Request
Step 2
Record Timesheets
Step 3
Create Equipment and Register Request
Step 4
Manage Change Orders and Daily Logs
Step 5
Create Risk Incidents
Job Order with Description Tab
Job Order with Material Plannings tab and Create Requisition Button
Open Created Requisition from Job Order
Open Created Purchase Orders from Requisition
Job Order with Consumed Materials Tab
Job Order with Material Requisitions Tab
Job Order with Timesheets Tab
Job Order with Maintenance Equipment Tab to Create Maintenance Equipment
Job Order with Maintenance Request Tab to Create Maintenance Request
Open Change Order from Job Order
Change Order Preview Button
Change Order Form View on My Account Portal
Project with Risk Register Tab and Create Incident Button
Incident Form View with Risk Management Tab
Customer Interim Payment Certificate (IPC)
Step 1
Prepare Customer IPC from Sale Order
Step 2
Verify Completed Work Quantities
Step 3
Generate Customer Invoice
Create IPC Button on Sale Order
Wizard of Generate Interim Payment Certificate from Sale Order
Created Customer IPC
Create Customer Invoice Button on Customer IPC
Created Customer Invoice with Advance Recovery and Retention Lines
Retention Entries Smart Button on Posted Customer Invoice
Retention Entry Form View with Create Invoice Button
Progress Billing
Step 1
Progress Billing Based on Actual Costs
Step 2
Billing Based on Purchase Quantities / Vendor Bill Quantities
Job Cost Sheet Material Tab with Acutal Purchased Quantity, Actual Purchased Cost, Actual Vendor Bill Quantity, Actual Vendor Bill Cost
Job Cost Sheet Labour Tab with Acutal Timesheet Hours, Actual Timesheet Cost
Job Cost Sheet Overhead Tab with Acutal Purchased Quantity, Actual Purchased Cost, Actual Vendor Bill Quantity, Actual Vendor Bill Cost with Create Invoice Button
Create Customer Invoice Wizard Open From Job Cost Sheet
Created Customer Invoice from Job Cost Sheet
Subcontractor Portal
Step 1
Login to the Portal
Step 2
Create and View Job Orders
Step 3
Create and View RFIs
Step 4
Create and View Deliverables
Step 5
Create and View IPC
Step 6
Access Job Orders, Change Orders and Documents on My Account
Customer Portal : IPC, Job Orders and Deliverables Management
Subcontractor Job Orders in My Account
Subcontractor Job Order Portal Form
Deliverables on My Account Portal with Create Deliverable Button
Deliverables Portal Form
PDF Reports
Tender Bid
Project BOQ
Job Costing
Job Estimation
Contract
Subcontractor Job Order
Material Requisition
RFI (Request for Information)
Submittals / Transmittals
Inspection
Change Orders
Profit and Loss Report
Project BOQ PDF Report
Tender Bid PDF Report
Job Inspection PDF Report
IPC PDF Report
Job Cost Sheet PDF Report
Job Cost Sheet Profit and Loss PDF Report
Print Change Order PDF Report
Print Job Estimate PDF Report
Print Job Order PDF Report
Print Purchase Requisition PDF Report
Print Subcontracting Job Order PDF Report
Railway Infrastructure Contract Management
Bid Creation
Step 1
Create Tender Bid
Step 2
Record tender opportunities
Step 3
Prepare bid data for estimation
Step 4
Create project if bid is won
Tender Bid Form with Tender Details Tab : Railway Construction Contract
Tender Bid Form with Documents Tab : Railway Construction Contract
Tender Bid Form with Location Details Tab and Project Creation Railway Construction Contract
Created Project Form View
Contract Management
Step 1
Create Contract
Step 2
Generate Initial Invoice
Contract Form View with Contact Details Tab
Contract Form View with Plan Details Tab
Contract Form View with Internal Note Tab
BOQ and Job Cost Sheet Setup
Step 1
Create Project BOQ
Step 2
Define materials, labor and overhead items
Step 3
Convert BOQ to Job Cost Sheet
Step 4
Create Job Estimation
Step 5
Generate project quotation / sale order
Bill of Quantity with Material
Bill of Quantity with Labour
Bill of Quantity with Overhead
Convert to Job Cost Sheet Button on BOQ
Converted Job Cost Sheet with Material Tab
Converted Job Cost Sheet with Labour Tab
Converted Job Cost Sheet with Overhead Tab
Job Estimate with Material Estimation Tab
Job Estimate with Labour Estimation Tab
Job Estimate with Overhead Estimation Tab
Create Quotation Button on Job Estimate
Open Created Quotation from Job Estimate
Subcontractor Job Order Execution
Step 1
Create Subcontractor Job Orders
Step 2
Assign Subcontractor Purchase Orders
Step 3
Track Deliverables
Step 4
Generate Subcontractor IPC
Step 5
Process Vendor Bill from IPC
Create Subcontractor Job Button on Job Order
Subcontractor Jobs Smart Button on Job Order
Subcontractor Job Order Description Tab
Created Subcontract Job Order Form with Subcontract Details Section
Subcontractor Job Order with Deliverables Tab
Subcontractor Job Order with Purchase Order Line and Create Purchase Order Button
Open Created Purchase Order from Subcontractor Job Order
Create IPC Website Form in Portal
View Created IPC on Portal
Interim Payment Certificate Signature Button on IPC Portal
Interim Payment Certificate with Digital Signature
Submitted Interim Payment Certificates on Portal
Vendor/Subcontractor Interim Payment Certificate Form View
Create Vendor Bill Option on Subcontractor IPC
Create Vendor Bill Button on Subcontractor IPC
Open Vendor Bill from Subcontractor IPC
Retention Entries Smart Button on Posted Vendor Bill
Create Vendor Bill Button on Retention Entry Form
Internal Job Order Execution
Step 1
Raise Material Request
Step 2
Record Timesheets
Step 3
Create Equipment and Register Request
Step 4
Manage Change Orders and Daily Logs
Step 5
Create Risk Incidents
Material Planning Tab on Job Order
Material Requisitions Tab on Job Order
Timesheets Tab on Job Order
Maintenance Equipment Tab on Job Order
Maintenance Requests Tab on Job Order
Purchase Requisition Form View
Create Incident Button on Job Order
Open Created Risk Incident from Job Order
Change Order Form View
Change Order Form with Change Order Preview Button
Change Order Form View on My Account Portal
Customer Interim Payment Certificate (IPC)
Step 1
Prepare Customer IPC from Sale Order
Step 2
Verify Completed Work Quantities
Step 3
Generate Customer Invoice
Create IPC Button on Sales Order
Open Generate Interim Payment Certificate Wizard from Sales Order
Open Created Customer IPC from Sales Order
Create Customer Invoice Button on IPC
Open Created Customer Invoice from IPC
Customer Invoice in Posted State
Retention Entries Smart Button on Customer Invoice
Open Retention Entry from Customer Invoice
Progress Billing
Step 1
Progress Billing Based on Actual Costs
Step 2
Billing Based on Purchase Quantities / Vendor Bill Quantities
Job Cost Sheet Material Tab with Acutal Purchased Quantity, Actual Purchased Cost, Actual Vendor Bill Quantity, Actual Vendor Bill Cost
Job Cost Sheet Labour Tab with Acutal Timesheet Hours, Actual Timesheet Cost
Job Cost Sheet Ovehead Tab with Acutal Purchased Quantity, Actual Purchased Cost, Actual Vendor Bill Quantity, Actual Vendor Bill Cost
Create Invoice Button on Job Cost Sheet
Create Customer Invoice Wizard Open on Job Cost Sheet
Open Created Customer Invoice from Job Cost Sheet
Airport Infrastructure Contract Management
Bid Creation
Step 1
Create Tender Bid
Step 2
Record tender opportunities
Step 3
Prepare bid data for estimation
Step 4
Create project if bid is won
Tender Bid Form with Tender Details Tab : Airport Infrastructure Contract
Tender Bid Form with Document Tab : Airport Infrastructure Contract
Tender Bid Form with Location Details Tab and Project Creation : Airport Infrastructure Contract
Created Project Form View
Contract Management
Step 1
Create Contract
Step 2
Generate Initial Invoice
Contract Form View with Contract Details
Contract Form View with Plan Details
Contract Form with Internal Note
BOQ and Job Cost Sheet Setup
Step 1
Create Project BOQ
Step 2
Define materials, labor and overhead items
Step 3
Convert BOQ to Job Cost Sheet
Step 4
Create Job Estimation
Step 5
Generate project quotation / sale order
Bill Of Quantities Form with Material Tab
Bill Of Quantities Form With Labour Tab
Bill Of Quantities Form with Overhead Tab
Convert Job Cost Sheet Button on BOQ
Converted BOQ Job Cost Sheet with Material Tab
Converted BOQ Job Cost Sheet with Labour Tab
Converted BOQ Job Cost Sheet with Overhead Tab
Job Estimate with Material Estimation Tab
Job Estimate with Labour Estimation Tab
Job Estimate with Overhead Estimation Tab
Create Quotation Button on Job Estimate
Open Created Quotation from Job Estimate
Subcontractor Job Order Execution
Step 1
Create Subcontractor Job Orders
Step 2
Assign Subcontractor Purchase Orders
Step 3
Track Deliverables
Step 4
Generate Subcontractor IPC
Step 5
Process Vendor Bill from IPC
Create Subcontractor Job Button on Job Order Form
Created Subcontract Job Order Form with Subcontract Details Section
Subcontract Job Order with Deliverables Tab
Subcontract Job Order with Purchse Order Line and Create Purchase Order Button
Purchase Order Form View Created from Subcontract Job Order
Create IPC Website Form View on Portal
Interim Payment Certificate with Digital Signature Option
IPC Backend Form with Selected Create Vendor Bill Option
Create Vendor Bill Button on Subcontractor IPC
Open Vendor Bill From Subcontractor IPC
Retention Entries Smart Button on Posted Vendor Bill Form
Open Retention Entry Form with Vendor Bill Creation
Internal Job Order Execution
Step 1
Raise Material Request
Step 2
Record Timesheets
Step 3
Create Equipment and Register Request
Step 4
Manage Change Orders and Daily Logs
Step 5
Create Risk Incidents
Job Order Form with Description Tab
Job Order Form with Material Planning Tab
Job Order Form with Material Requisition Tab
Job Order Form with Timesheet Tab
Job Order Form with Maintenance Equipment Tab
Job Order Form with Maintenance Requests Tab
Purchase Requisition Form View
Create Incident Buttton On Job Order
Risk Incident Form View Created from Job Order
Change Order Form View
Change Order Form with Change Order Preview Button
Change Order Form View on My Account Portal
Customer Interim Payment Certificate (IPC)
Step 1
Prepare Customer IPC from Sale Order
Step 2
Verify Completed Work Quantities
Step 3
Generate Customer Invoice
Create IPC Button On Quotation
Open Create IPC Wizard Form
Open Created Customer IPC from Quotation
Create Customer Invoice Button On IPC
Open Created Customer Invoice from IPC
Retention Entries Smart Button On Customer Invoice Form
Retention Entry Form View
Progress Billing
Step 1
Progress Billing Based on Actual Costs
Step 2
Billing Based on Purchase Quantities / Vendor Bill Quantities
Job Cost Sheet Material Tab with Acutal Purchased Quantity, Actual Purchased Cost, Actual Vendor Bill Quantity, Actual Vendor Bill Cost
Job Cost Sheet Labour Tab with Acutal Timesheet Hours, Actual Timesheet Cost
Job Cost Sheet Overhead Tab with Acutal Purchased Quantity, Actual Purchased Cost, Actual Vendor Bill Quantity, Actual Vendor Bill Cost
Create Invoice Button on Job Cost Sheet
Create Customer Invoice Wizard Open on Job Cost Sheet
Open Creted Invoice From Job Cost Sheet
System Menus, Views and Configuration
Bids Kanban View
Bids List View
Work Category Menu and List View
Tender Types Menu and List View
Bid Types Menu and List View
Bid Stages Menu and List View
Bid Tags Menu and List View
Change Orders Menu
Change Orders List View
Project Kanban View
Job Inspections Menu
Job Inspections List View
Job Inspection Form View
Job Inspection Other Info Tab
Job Inspection Internal Note Tab
Job Inspection Result Description Tab
Job Inspection Photos Tab
Inspection Types
Inspection Types List View
Inspection Values Menu
Inspection Values List View
Inspection Results
Inspection Results List View
Project Notes Menu
Project Notes Kanban View
Project Notes List View
Project Notes Activity View
Job Orders Menu
Job Orders Kanban View
Job Orders List View
Job Orders Calendar View
Job Orders Pivot View
Job Orders Graph View
Job Orders Line Chart View
Job Orders Pie Chart View
Job Notes Menu
Job Notes Kanban View
Job Notes List View
Job Notes Activity View
Maintenance Checklist Menu
Maintenance Checklists List View
Maintenance Request Form View
Maintenance Request with Maintenance Plan Material Tab
Maintenance Request with Create Job Order Button and Maintenance Equipment Checklist Tab
Open Created Job Order from Maintenance Request
Create Material Requisition Button on Maintenance Request
Open Created Purchase Requisition from Maintenance Request
Project BOQ Menu
Project BOQ List View
Job Cost Sheets Menu
Job Cost Sheets List View
Request for Information Menu
Request for Information Kanban View
Request for Information List View
Request for Information Pivot View
Request for Information Form View
RFI Answer Tab on Request for Information
Survey Tab on Request for Information
Survey Smart Button on Request for Information
RFI Timesheet Tab on Request for Information
RFI Subjects Menu
RFI Subjects List View
RFI Stages Menu
RFI Stages List View
RFI Team Menu
RFI Team List View
RFI Types Menu
RFI Types List View
RFI Report Menu
RFI Report
Request for Information Bar Chart Graph View
Request for Information Line Chart Graph View
Request for Information Pie Chart Graph View
Submittals Menu
Submittals List View
Submittal Form View
Submittal Form View with Description Taken By Recipient Tab
Submittal Form View with Reason For Sending Tab
Transmittals Menu
Transmittals List View
Transmittal Form View
Transmittal Form View with Description Taken By Recipient Tab
Transmittal Form View with Reason For Sending Tab
Transmittal / Submittal Mediums Menu
Transmittal / Submittal Types Menu
Survey Kanban View
Daily Logs Menu
Daily Logs List View
Daily Logs Form View
Directories and Documents Menu
Parent Directories List View
Directory Form View
Documents Smart Button on Parent Direcotry Form View
Open Documents from Parent Direcotry Form View
All Documents Kanban View
Directory and Document Tags Menu
Directory Tags List View
Document Tags List View
Job Orders Line Chart Graph View
Job Orders Pie Chart Graph View
Job Orders Bar Chart Graph View
Contact / Support
Introducing
Probuse Consulting Services Pvt. Ltd.
If you need any help or want more additional features, you may contact us through:
Email: contact@probuse.com
Website: www.probuse.com
Skype: mustufa_probuse
Probuse Consulting Service Pvt Ltd is an Software and Web development specialist which offers complete business application together. We are well experienced to provide a face for your business on the software and Internet level.
Probuse Consulting Service Pvt Ltd is a specialist in Odoo/OpenERP services and could give your business open source hand to drive.
Our Services
Odoo Implementation
Odoo Support
Odoo Customization
Odoo Migration
Odoo Training
Odoo Proprietary License v1.0 This software and associated files (the "Software") may only be used (executed, modified, executed after modifications) if you have purchased a valid license from the authors, typically via Odoo Apps, or if you have received a written agreement from the authors of the Software (see the COPYRIGHT file). You may develop Odoo modules that use the Software as a library (typically by depending on it, importing it and using its resources), but without copying any source code or material from the Software. You may distribute those modules under the license of your choice, provided that this license is compatible with the terms of the Odoo Proprietary License (For example: LGPL, MIT, or proprietary licenses similar to this one). It is forbidden to publish, distribute, sublicense, or sell copies of the Software or modified copies of the Software. The above copyright notice and this permission notice must be included in all copies or substantial portions of the Software. THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE.
Please log in to comment on this module